Fabric Production Scheduling
This is the module that lets the production staff enter what a machine will produce. There are three sections to the module:- The status of machines. That is when they are due to finish the scheduled fabric production. This is updated based on density , weft insertion rate , warp length and the stoppages that occur.
- Task details. This section at the lower left contains all the tasks for the particular machine. Previous tasks and scheduled tasks are able to be displayed. All the required details are in this section.
- If implemented, you can also track the fabric produced by each roll of fabric, to use this feature, the operator must notify the system with the Android app.